X
Need an Account? Register Today! Forgot Password?

what-do-i-need-to-include-in-my-traffic-control-plan

What do I need to include in my Traffic Control Plan?

A Traffic Control Plan shall comply with the requirements of the Manual of Uniform Traffic Control Devices (MUTCD) in force on the date of the application and shall include a dimensional drawing that identifies the following:

  1. The location of the right-of-way (ROW) to be closed, including all approaches.
  2. The location of the detour route
  3. The location of all traffic control devices (cones, wood barricades, etc.) required for the closure of the ROW and signage for the detour route(s).